by Peter Boyles | Feb 19, 2024 | Blasting with Boyles
I remember being in high school and reading … and I had to check this… Frank R. Stockton’s short story from 1882, The Lady or the Tiger. It’s a story about a nasty king who rules the land and has a public trial by ordeal of someone who was opposed to his rule. A handsome young man is accused of the crime and is brought into the public arena and must choose one of two doors. Behind one door is a woman who the king has chosen to be a match for the accused and behind the other is a hungry tiger.
Both doors are soundproofed to prevent the young man from hearing what’s behind each one. If he chooses the door with the woman behind it, he’s innocent but must immediately marry her. If he chooses the tiger, he is deemed guilty and you can only imagine.
The king then learns that his daughter has a lover, the handsome young man. The Princess realizes that the woman behind the door is someone she hates, a rival for the love of the accused. When he looks to the Princess for help, she indicates the door on his right which he opens. The choice is never revealed. It’s always left up to all of us who comes out of the open door, the lady or the tiger.
The Princess’ dilemma is she loses her handsome young man either way. He’s eaten by the tiger or married to her rival. It’s a dilemma we all face now. Joe Biden is behind one door and Donald Trump behind the other. Joe Biden every day slips further and further into dementia. It’s overwhelmingly self-evident that Biden’s mental abilities come into question after the Special Counsel report of his handling of classified documents, he was dubbed an elderly man with a poor memory.
There are seemingly no more Biden protectors or defenders. Joe is a year older than I am and kept saying his memory was fine and for all of us to take a look at what he’s done since he became president. That’s the last thing I’d be saying, Joe. Seemingly every focus group that I’m able to read on the internet will mention they don’t believe Joe has all of his faculties.
Now comes Donald Trump. Enough things have been said about Donald Trump that I don’t need to go back over them in this column. But what we face is the rematch that most Americans don’t want. Nationwide polls have Donald Trump leading Biden, and a lot of unsure people are people that are planning to vote for someone else. I’ve been asked many times, as if it matters, Peter, what do you think is going to happen? In 1968 Lyndon Johnson went on national television and told the American people he’s not going to seek the nomination in the November presidential election. That the torch would pass to Hubert Humphrey.
How do we shake out of this? Yogi Berra once said, “Predictions are hard to make, especially about the future.” Will Donald Trump return to the White House? Will Joe Biden return to the White House?
Given how the United States is in the world today, given all the different scenarios and tragic potential outcomes, will Biden step aside? Who’s in the wings? Will the Republican Party turn away from Donald Trump knowing he cannot win a general election? It’s an extremely dangerous time in the world. Joe Biden is having memory lapses and Donald Trump absolutely scares the hell out of me. Which will it be the lady or the tiger? We stand in the arena reaching for a door handle.
— Peter Boyles
by Mark Smiley | Jan 19, 2024 | General Featured
by Mark Smiley
For those who want to hit the slopes but avoid the drive over the President’s Day holiday weekend, Snowstang will be operating and providing service to some of the state’s premier mountain resorts.
Snowstang travels roundtrip to Arapahoe Basin, Breckenridge, Copper Mountain, Loveland Ski Area, and Steamboat Springs every Saturday, Sunday, and President’s Day (Monday, February 19) through mid-spring. All routes board at Denver Union Station, RTD’s Federal Center Station in Lakewood, and at the Wooly Mammoth Park-n-Ride — upper lot (18560 U.S. 40, Golden, CO 80401).
Roundtrip tickets are $25, except for Steamboat Springs, which is $40. Additional discounts are available for seniors (65+) and people with disabilities. Children ages 2 to 11 ride for $12.50 (with a paying adult). Tickets can be purchased at ridesnowstang.com
“If you like to ski or snowboard but don’t like dealing with the holiday weekend traffic, Snowstang is an ideal option,” said CDOT Executive Director Shoshana Lew. “And it’s not just this weekend. If people want to enjoy the variety of activities and special events that’ll be taking place at our partner resorts this winter and early spring, Snowstang is a great travel alternative on any weekend.”
Each Snowstang coach provides seating for 51 passengers, is climate controlled, and has luggage bays, Wi-Fi, a restroom, and USB and power outlets.
“This is our fourth season of serving skiers and snowboarders, and it continues to grow in popularity since it provides a stress-free, safe alternative to get to our world-class resorts,” said CDOT’s Division of Transit and Rail Director Paul DesRocher. “Snowstang is also affordable, comfortable, and convenient, dropping passengers off right near the ski lifts.”
by Valley Gadfly | Jan 19, 2024 | Main Articles
Ten New Projects To Convert Cherry Creek’s 16-Blocks Into Colorado’s Top Urban Community By The End Of Decade
by Glen Richardson

Changing Cherry Creek: Here’s what architects- developers are proposing for the former Sears store site at 2nd Ave. & Adams. Demolition is set to begin April 1. Completion is anticipated as soon as the third quarter of 2025.
The push to build new office, retail, and apartment projects in Cherry Creek North as 2024 gets underway is unlike anything the district has ever seen. Construction is set to experience its best year on record, with developers launching 10 projects as the new year begins.
The latest construction boom, moreover, mostly ignores the $1 billion Cherry Creek West mall project, though it is inching closer to reality along University Blvd. Construction at that site isn’t scheduled to start until at least the third quarter of 2024, with the first building not ready for occupancy until 2027. A gargantuan development, nonetheless, authorities say the project will create 50% of new Cherry Creek Valley jobs and 30% of new households through the year 2040.
This year’s construction ricochet will likely push the district into becoming the new epicenter of the Mile High City, as downtown continues to struggle. For several years now, companies have established offices or headquarters in Cherry Creek, increasingly solidifying the district as the Mile High City’s hub.
Mixed Use Move
As businesses add more space along the district’s 16 blocks, this much is clear: Once simply a shopper’s haven, developers are converting the neighborhood into a live, work, and play destination. Moreover, due to crime and homelessness issues downtown, more travelers are choosing to stay in Cherry Creek-Glendale hotels.
While more of a mixed-use district, the area nevertheless has developers once again adding retail space to the latest Cherry Creek projects.
The district’s thriving office market, as expected, remains one of the nation’s best. The latest construction trend suggests an increase rather than slackening in office demand.
Schnitzer Eight-Story

Swift Schnitzer Start: Expected to be completed by the third quarter of 2025, Schnitzer West, LLC, broke ground at 201 Fillmore on this eight-story building on Nov. 4, 2023.
Schnitzer West, LLC, broke ground back on Nov. 4, 2023, at 201 Fillmore on an eight-story building it expects to complete by the third quarter of next year (2025).
The building’s 130,000-sq.-ft. of office space on seven floors will house one of Colorado’s largest independent oil and gas firms. Antero Resources is currently headquartered near Union Station on Wynkoop St. The 8,600-sq.-ft. of ground floor retail space will feature a restaurant, plus another eatery is tentatively taking the rooftop terrace.
The development will have five levels of below-grade parking, with 250 spaces for office and retail use. There will be secure loading docks for tenant’s use.
Scraping Sears Site
One of the largest and definitely Cherry Creek’s longest anticipated, demolition of the Sears Building at 2nd Ave. & Adams is set to begin April 1. The site will be replaced with a blend of office and retail spaces in a five-story package. Like the 201 Fillmore project, completion is probable by the third quarter of 2025 albeit more likely by year’s end. The 90,000-sq.-ft. site will feature a mix of masonry, steel, and glass.
With the Crate & Barrel building, size of the parcel totals 9.4 acres. According to plans, the Crate & Barrel building will be demolished down to grade level, though the parking garage will remain. It will be replaced with a new five-story mixed-use residential-apartment building. BMC Investments CEO Matt Joblon is working with Crate & Barrel on relocation to a new temporary or permanent space, possibly within the site.
Broe Building Bulge

Broe Buildup: In addition to launching an eight-story office project on Clayton this month, Broe wants to demolish its 10-story 50 S. Steele St. office site and build this 12-story, 378-unit apartment building with ground floor retail.
Broe Real Estate Group — the multi-billion-dollar developer headquarters on Clayton St. in Cherry Creek — is beginning the second phase of its office redevelopment project by launching an eight-story, 175,000-sq.-ft. mixed use office project at 250 Clayton. Completion is anticipated in early 2026. Tenants will have access to floorplates as large as 27,000-sq.-ft. The site will also include retail space. Broe plans to later demolish the parking garage and building at 252 Clayton St., and build another seven-story office building there.
Broe has also asked to demolish the site of its 10-story office building at 50 S. Steele St. They seek to build a 12-story, 478-unit apartment complex with ground floor retail across from the eastern end of the Cherry Creek Shopping Center.
As 2023 closed, Broe purchased the 587-unit Seasons of Cherry Creek apartment complex on E. Ellsworth Ave. One of the largest real estate transactions in Cherry Creek history, Broe paid $225 million. The 480-unit complex is spread across three buildings on 5.2 acres.
Betwixt & Between
Plotting to build on every plot, Alpine Investments will erect a mixed-use office- retail building on a 0.57-acre site at 2645 E. 2nd Ave. between the Cherry Cricket and the Clayton Hotel & Members Club.
Development of the site will require the demolition of the one-story rear portion of the Cherry Cricket, where restrooms are located. The front of the restaurant building along E. 2nd Ave. will remain. The office building will include three levels of below-grade parking plus ground-floor retail space.
The two-story portion that currently houses Cherry Creek Tailoring & Alterations and cocktail bar Forget Me Not, however, will be bulldozed.
More From BMC

Major Housings: BMC Investments is building an eight-story major league apartment complex at Milwaukee and 3rd Ave. The structure will feature 30,000-sq.-ft. of ground floor retail.
In addition to the Sears building site, MBC Investments is breaking ground on two projects along Milwaukee Street as 2024 begins. One of Cherry Creek’s most active-successful developers, BMC is adding a seven-story mixed-use project at 242 Milwaukee St. It will feature 84,000-sq.-ft. of office space and 10,000-sq.-ft. of retail plus 202 parking spaces.
On the corner of 3rd Ave. and Milwaukee, an eight-story apartment structure is being erected. It will have 156 luxury units plus 30,000-sq.-ft. of ground floor retail. Being designed for those seeking a moderate-sized floorplan, units will average 885-sq.-ft. The site will include studios, junior one-bedrooms, and two-bedroom plus den units.
A rooftop pool, outdoor grilling area, fire pit, and dining area are planned. More: Sauna, co-working areas, meeting rooms, and bike repair shop are included. A resident lounge and parking garage will also be built.
A Pair On 2nd Ave.

Cricket Or Not: Alpine Investments is erecting this office-retail building on an 0.57-acre site between the Cherry Cricket and the Clayton Hotel & Members Club at 2647 E. 2nd Ave.
Residents have come to expect Cherry Creek to be in constant change. However, that hasn’t been the case for a trio of projects a block apart on the south side of 2nd Ave. For at least two — at 2nd and Steele and 2nd and St. Paul — construction is set to break ground. A lot directly east of the Cherry Creek Grill at 2nd and Adams has sat empty for two years. Owned by Bow River Capital’s Blair Richardson, it was first proposed as offices and later a five-story condo site. Construction remains unlikely.
Directly across Steele Street from the Grill, where Patxi’s Pizza closed a year ago and Bloom by Anuschka does business, a five-story, 37 condo development will be built. The $50-million project will have 3,532-sq.-ft. of ground-floor retail and 4,360-sq. ft. of restaurant space. There will also be a 75-space underground garage.
A block further west at 190 St. Paul St. —where Italian restaurant Piatti has sat empty since Christmas of 2021 — a five-story, 272,000-sq.-ft. condo project will be built by luxury brand Waldorf Astoria. The site will have a 5,360-sq.-ft. restaurant and 3,532-sq.-ft. of retail plus a 70-space underground parking garage.
Space On Cook
Dallas-based Mill Creek Residential is breaking ground on a six-story, 110 Apartment complex on the southwest corner of 2nd Ave. and Cook Street (155 & 165 Cook St.). The structure is replacing a pair of three-and-four-story office buildings. Completion is expected in early 2025.
Rough Road Ahead
The impressive growth proposed and promoted with Cherry Creek’s latest developments is certain to create transportation, traffic congestion, and parking problems. Residents living in the neighborhood care about the district’s future, and want to maintain the quality of life and success they now enjoy.
The attraction of businesses and their office space needs has accelerated the desire of certain businesses to move to Cherry Creek from other areas of the city. Actual development has already exceeded the 10-year forecasts.
Next month the Chronicle will look at Cherry Creek’s first major analysis of BID’s growth and development. The report offers tough recommendations that need to be made before it is too late to make a difference.